Generator: pilot analysis and fixes; G0002-G0021 tasks; handover notes merged
- Static bundle checks (name length, seed type, reserved words, contract test classes, testclasses_file), local abaplint parser check before SAP, max_tokens, robust JSON parse - Runner: G2 for CDS views with parameters, contract_check detail in report - G0020 and G0013 fixed by review and revalidated (oracle 100, null 0) - Pilot results in docs/faz1-tasarim.md 11e; handover notes merged into CLAUDE.md and docs Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
42
tasks_gen/eval/G0017/spec.md
Normal file
42
tasks_gen/eval/G0017/spec.md
Normal file
@@ -0,0 +1,42 @@
|
||||
# 1. Goal
|
||||
Show the effort of each project. A report and an OData service read the effort,
|
||||
so the calculation must be in the database, in a CDS view.
|
||||
|
||||
# 2. Open questions
|
||||
None.
|
||||
|
||||
# 3. Context
|
||||
- Table {{P}}PROJ (project), package $TMP. Key: PROJ_ID (CHAR 10).
|
||||
Fields: PROJ_NAME (CHAR 30), BUDGET (DEC 15,2).
|
||||
- Table {{P}}ASGN (project assignment), package $TMP. Key: PROJ_ID (CHAR 10),
|
||||
EMP_ID (CHAR 10). Fields: WORK_HOURS (INT4, the hours of the assignment),
|
||||
RATE (DEC 15,2, cost of one hour), STATUS (CHAR 1).
|
||||
|
||||
# 4. Contract
|
||||
- Create the CDS view entity {{P}}I_PROJ_EFFORT in package $TMP.
|
||||
- Elements, with these names: PROJ_ID (key), PROJ_NAME, ASSIGN_COUNT,
|
||||
TOTAL_HOURS, TOTAL_COST, OVER_BUDGET.
|
||||
- No authorization check (#NOT_REQUIRED).
|
||||
|
||||
# 5. Business rules
|
||||
1. Show one row for each project that has at least one active assignment.
|
||||
An assignment is active when its STATUS is 'A'. An assignment with
|
||||
another status is not active. A project without active assignments does
|
||||
not appear in the view.
|
||||
2. ASSIGN_COUNT is the number of active assignments of the project.
|
||||
3. TOTAL_HOURS is the sum of WORK_HOURS of the active assignments of the
|
||||
project.
|
||||
4. TOTAL_COST is the sum of WORK_HOURS multiplied by RATE of the active
|
||||
assignments of the project, with 2 decimals.
|
||||
5. OVER_BUDGET is 'X' when TOTAL_COST is greater than the BUDGET of the
|
||||
project. Otherwise OVER_BUDGET is 'N'.
|
||||
|
||||
# 6. Constraints
|
||||
- Release target: 7.58.
|
||||
- Coding standards: Clean ABAP.
|
||||
- Out of scope: do not change {{P}}PROJ and {{P}}ASGN.
|
||||
|
||||
# 7. Acceptance
|
||||
- The view is active and has no syntax error.
|
||||
- The hidden tests pass.
|
||||
- Write ABAP Unit tests with CL_CDS_TEST_ENVIRONMENT in a global test class.
|
||||
Reference in New Issue
Block a user